@RWG ContractsMaybe an obvious answer but if a shed is say 100' x 40' is the 40' the inside width or outside width from h beams
@RWG ContractsMaybe an obvious answer but if a shed is say 100' x 40' is the 40' the inside width or outside width from h beams
length is bay crs width is outside of steels, on an industrial building the span is generally the centre line of the main postsMaybe an obvious answer but if a shed is say 100' x 40' is the 40' the inside width or outside width from h beams
Sizes are "overall" ie outside edges.Maybe an obvious answer but if a shed is say 100' x 40' is the 40' the inside width or outside width from h beams
As its going on a base and not portable i would say the least you need is permitted development(28 day notice) but remember if you take the 28 day notice route you will be removing the right of any conversions under part QEvening,
is planning permission required to erect a grain bin? I am thinking 24' diameter corrugated tin as opposed to a 10t bin on steel legs
Thanks
Best to check i am no expert,but i think it will be classed as development as its permanent and not portable so would need a consent,if it was a feed hopper i would not bother but i would be checking for the bin you speak ofAs in, you would need permission for the concrete base anyway?
As its going on a base and not portable i would say the least you need is permitted development(28 day notice) but remember if you take the 28 day notice route you will be removing the right of any conversions under part Q
I don't have the GPDO to hand or memorised verbatim so please don't take this as gospel but I believe you can make as many non part q applications as you need up to a total of 465m2 area within a two year period.Am I right in thinking if you do a 28-day PD then you can do another, including a part Q (assuming it still exists) after 2 years have gone by? But if you do a part Q you cannot apply for any PD for the next ten years?
Part Q is the conversion of Agricultural buildings to ResidentialWhat is a 'part Q' ?
Its a bit complicated,you can not do part Q if you built a building under the prior notification (28 day) after 20th march 2013 or 10 years has lapsed, however if you had the prior approval and not built the building you can still do part Q as the key words are "no development under part 6 has taken place" , so put in a 28 day prior approval now and when it has passed in a months time you can apply for a part Q as long as you have not built the 28 day building or do a part Q application now and in 56 days if it has passed you can apply for a 28 day building as normal as long as you have not started the part Q conversion ,once the part Q is started you can still apply for farm buildings by full planning applications and if you can justify the need for the farm building the LPA will find it difficult to refuse There are other options if you have built part 6 building since 20th of march 2013 but these are a bit more contentiousAm I right in thinking if you do a 28-day PD then you can do another, including a part Q (assuming it still exists) after 2 years have gone by? But if you do a part Q you cannot apply for any PD for the next ten years?
I would ask the council to provide you with a map showing you are in such an area. They are usually surrounding high pressure gas pipelines, nuclear facilities etc.anyone ever had anything to do with this part k ii.
http://www.legislation.gov.uk/uksi/...agricultural-buildings-to-dwellinghouses/made
Development is not permitted by Class Q if—
(k)the site is, or forms part of—
(i)a site of special scientific interest;
(ii)a safety hazard area
council seem to be trying to put me off at the first hurdle, they reckon I'm part of a safety hazard area but I cant find a map with these areas marked on anywhere feel like I'm being fobbed off but cant find anything to prove them wrong, or right?
its for permitted development class Q changing stone farm buildings into dwellings
Syngenta chemical works? 0.78 miles 1.25km (accurately measured as the crow flies) away from here?I would ask the council to provide you with a map showing you are in such an area. They are usually surrounding high pressure gas pipelines, nuclear facilities etc.
Syngenta chemical works? 0.78 miles 1.25km (accurately measured as the crow flies) away from here?
council don't seem very keep to cooperate so ill hold my horses on that front until I need to.
if it was so bad would you have a football stadium and cinema 0.93 miles away from it? and lots of houses within 1 mile.
what does it actually mean other than I will have to have full planning for exactly what I could have got under class Q?
signed up for this and got access to it now just comes up that I am in a major hazard theres a number to ring so might see what they say tomorrow, only got so far as I'm too tight to pay for "credits" comes up that my application is more than 40 houses per hectare but I could colour a whole field in and label it landscapeing? or does it really matter? its only 4 dwellings
I don't know simple answer but there may be a dispensation for low density housing buwww.hse.gov.uk/landuseplanning/about.htm
signed up for this and got access to it now just comes up that I am in a major hazard theres a number to ring so might see what they say tomorrow, only got so far as I'm too tight to pay for "credits" comes up that my application is more than 40 houses per hectare but I could colour a whole field in and label it landscapeing? or does it really matter? its only 4 dwellings
to be honest the pavements and bus stop close by wont affect me, the bus stop is pretty much as close as it could be without the bus comeing into the farm yard to turn around and as for pavements the farm lane is restricted in width between private properties (not mine) so out of my control and as it already has around 15 houses on it the 5 houses before it must be a full highway spec doesn't apply (as far as I know)I don't know simple answer but there may be a dispensation for low density housing buView attachment 605778 t if you are in a safety hazard area obviously this rules out the part Q,Look at the the full planing route for reuse of underused/derelict buildings in the green belt this will allow a change of use from ag to residential but will cost more but won't be cost prohibitive but you will have to comply with sustainable development so will need pavements and bus stops close by