Nearly
Member
- Location
- North of York
Hi, just had the letter for the above. Sign the enclosed wayleave if you're an idiot and we'll start straight away.
Taking it down to a agent chap this aft but just wanted opinions from you lot.
Obvious issues are depth and how far out from the BIG trees on the boundary. As well as damage involved in getting the job actually done on yellow clay land in January and subsequent reseeding and drainage repairs (it's along the bottom edge of the field where all the drains run out).
They've probably decided to (try to) put it underground because of the big trees and their big branches.
The route across my field avoids a (6x) longer route down a little council tarmac lane with major overhanging tree problems.
Thanks.
N
Taking it down to a agent chap this aft but just wanted opinions from you lot.
Obvious issues are depth and how far out from the BIG trees on the boundary. As well as damage involved in getting the job actually done on yellow clay land in January and subsequent reseeding and drainage repairs (it's along the bottom edge of the field where all the drains run out).
They've probably decided to (try to) put it underground because of the big trees and their big branches.
The route across my field avoids a (6x) longer route down a little council tarmac lane with major overhanging tree problems.
Thanks.
N