We are infilling the current canopy so there will be approximately 32m2 of new floor area which is currently undercover but not enclosed.Are you doing an extension on it as in the pictures it’s not in line with the gate way.?
We are infilling the current canopy so there will be approximately 32m2 of new floor area which is currently undercover but not enclosed.Are you doing an extension on it as in the pictures it’s not in line with the gate way.?
I've done both on this one. It's much more satisfying going the other wayI prefer taking down,
Looks like you need a new mowerAfternoon in the workshop now stripping it down to see what I need
Needed 1 last time it was rebuiltLooks like you need a new mower
How you planning to sort where the bolts hold the disc to the bed is it replaceableNeeded 1 last time it was rebuilt
Just buy a new section I'd sayHow you planning to sort where the bolts hold the disc to the bed is it replaceable
Yeh all sectional, on closer inspection there’s an older hole in bed that couldn’t be seen under disc, looks like lube has dried up through there then internal bearing collapsed and sheared disc housing off when jammedHow you planning to sort where the bolts hold the disc to the bed is it replaceable
How can the grease dry up through the hole, they are sealed.Yeh all sectional, on closer inspection there’s an older hole in bed that couldn’t be seen under disc, looks like lube has dried up through there then internal bearing collapsed and sheared disc housing off when jammed
I see that now I’ve got it apart, I forgot they are sealed units, 1 new gear housing needed and 1 spacer unit each side, also the bar that keeps the whole thing together has picked up the threads when loosening the nut off , but it’s all to bits awaiting parts nowHow can the grease dry up through the hole, they are sealed.
I had to look twice before I realised you had cut the field you were inView attachment 1047030
Talking about Lely...
Third cut half down. Not that thick but hopefully rocket fuel.