Recent content by akaPABLO01

  1. akaPABLO01

    Panel cleaning cost

    I’ve had a large industrial roof go as low as 60% annual output and back to 100% after cleaning. so on that point you should have an annual output which you should measure over a 2 year period minimum. Some years will be good others bad. Measure the difference over years and if the output...
  2. akaPABLO01

    Swimming pools and RHI

    You can heat the pool room but not the water. (If attached to main building and included on the heat loss - this will contribute huge heat loss and bring the EPC grade down though, like conservatories which are a pain in the ass to heat)
  3. akaPABLO01

    Swimming pools and RHI

    On public commercial for rhi, not domestic.
  4. akaPABLO01

    New supply meter

    It’s probably work out better if not the same releasing the gifted deemed export and lumping all export on ppa market place.
  5. akaPABLO01

    New supply meter

    No, the only thing paramount is no extra panels added and if the generation meter is changed, it’s updated with fit payee or Ofgem. a few sites of mine have had upgrades from increase in supply with new meter and new sub stations built. Doesn’t affect FiT at all just don’t add panels.
  6. akaPABLO01

    Applying for a grid connection

    Moved on with the collapse, but still pop in to share the little knowledge I have when topic requires.
  7. akaPABLO01

    Applying for a grid connection

    This type of harvesting sites and auctioning off has been going on since the start. if they apply for the DNO then they’ve really done their homework and grid study. It'll cost them thousands to make the application but what they’ll be banking on is collecting enough to offset costs and get...
  8. akaPABLO01

    New supply meter

    A change in supply capacity will always generate a new MPAN number. I didn’t have an issue with building an array on an MPAN, upgrading new supply with new supply meter and MPAN then registering a new extension array on the new MPAN. Both arrays still claim. who told you you were constrained...
  9. akaPABLO01

    Ground source heating in a new build

    Install it radiators work fine if designed correctly
  10. akaPABLO01

    GS 59 witness tests

    https://www.howpow.co.uk/contact-us.php
  11. akaPABLO01

    Small area big power

    Getting planning for a GSHP is hard enough but nuclear plant LOL Good luck with this pipe dream for at least 30 years
  12. akaPABLO01

    New Roof Mount Solar

    10kW No, not unless you have island mode, disconnected from supply solar feeding directly or through a battery system. Cost wise, not viable as you’ll need switch gear in winter when you need mains supply as the solar can’t provide. The amount of power needed would be a ratio of 5:1 solar...
  13. akaPABLO01

    Basic Solar Wiring

    https://www.ofgem.gov.uk/system/files/docs/2019/12/seg_guidance_for_generators_0.pdf To apply for export under the new export guarantee you’ll need MCS certificate under <50kW Export MPAN SMETS2 (smart meter V2) you can’t get anything with DIY and it’ll need connecting with a competent...
  14. akaPABLO01

    G59 Upgrade??

    Ok, for a second time I’ll say this as clearly and as s l o w l y so it may sink in. apart from the relay g59, is your equipment g59 regulated?
  15. akaPABLO01

    G59 Upgrade??

    I’m surrounded by two fools at a poker table here. do both of you realise you’re full of crap or do you actually believe what you’re saying? sarcasm doesn’t traverse t’interwebs with clarity. forgive me, trying to construct a clear coherent question here. Help me out, what are you both...