I bought a vibrating screed. It is 10ft wide.
I need to do a shed floor that is 30ft wide. I'm thinking of breaking this into 3 different days and doing 10ft widths per day. This is to give us a chance as there will be only two on us at and not to be overwhelmed by too much concrete at once. Will this work ok?
For the first run the concrete will be going up against the wall. There won't be Form work at the inside for the vibrating screed to run along but there will be 6 inch formwork on the outside for it to run along. Will the screed sink in the inside due to having nothing to run along?
I need to do a shed floor that is 30ft wide. I'm thinking of breaking this into 3 different days and doing 10ft widths per day. This is to give us a chance as there will be only two on us at and not to be overwhelmed by too much concrete at once. Will this work ok?
For the first run the concrete will be going up against the wall. There won't be Form work at the inside for the vibrating screed to run along but there will be 6 inch formwork on the outside for it to run along. Will the screed sink in the inside due to having nothing to run along?