That’s not thrashed! Its very pretty, good job
Done 180 of this one, another 270 to do. Weekend and evening hobby job!I'll get you a better one tomorrow! Havn't taken any close side on pics yet. Bad enough comparing it to the pro hedgelayers on Instagram!
Got much to do?
View attachment 1011280
Starting to open it up now. Was cutting them in half yesterday butView attachment 1011306View attachment 1011307 tracking in and out was taking too long for me , So today coming down in one piece
Flat out- don't look backMy baling contractor is not in my good books this year. Getting lots of bales with net not only outside the bale but right into the bale.
Latest bale had 3 wraps outside and a further 16 into the bale. Trying to pull that lot out was not fun, especially with a hungry bull fighting to get to feeder.
View attachment 1011372
Im having a few too, mostly i think the pickup has drawn crop in while the net was going on but also the contractors have baled up broken bales without pulling the net out of the tump of loose. Both problems caused by the baler man rushing imo. I try to sort the nets out it if i can see they have had a loose bale. Bloody annoyingMy baling contractor is not in my good books this year. Getting lots of bales with net not only outside the bale but right into the bale.
Latest bale had 3 wraps outside and a further 16 into the bale. Trying to pull that lot out was not fun, especially with a hungry bull fighting to get to feeder.
View attachment 1011372
Love to have a digger, think i would level the place!Starting to open it up now. Was cutting them in half yesterday butView attachment 1011306View attachment 1011307 tracking in and out was taking too long for me , So today coming down in one piece
Week ! Would take me a monthThis week's project and it never gets any easier.
Horible digging all the way and all the old concrete and wooden posts had been concreted in .
I'm getting too old for this malarkeyView attachment 1011430View attachment 1011431View attachment 1011432View attachment 1011433View attachment 1011434View attachment 1011435
Well a week for the full job ,,Monday clearing the overgrown hedge back out the way ,Tuesday breaking the old concrete posts out ,new posts came Wednesday 8.30am ,had 8 panels in by 3.30 ,10 yesterday ,dropped the last 2 1/2 panels in this morningWeek ! Would take me a month
I'd be scrap at the half way point ....
Infact I'm knackered just looking at it