I'd show them the infiltration tests of cultivated ground as opposed to direct drilled.
And insist on a site visit to see the water running off it, and if it is just the footpath tell them to close the footpath off in future years to mitigate against future arisings.
The only time I've had...
That's a major repair.
Get it sent away and done properly, for your peace of mind or you'll never want to venture far from home.
There's a guy over here does them, was nice and quick but haven't used since covid.
It only takes me 2 days to do the farm at those spacings.
So cost is very low IMO.
I'm doing it because it works.
The farm is drier than it's ever been, I don't see the point in letting it get to the point of being wet before remedying it. Keep it good and with luck it'll pay dividends.
I...
betty crocker gluten free devils food cake mixes are great, and her gluten free brownie mixes.
Home made GF pancakes are great, just substitute with doves GF plain flour.
I really don't miss out on anything, but the whole house eats GF pretty much now.
The list of folk who don't want to abide by the rules isn't far from home in most of the country IMO.
I certainly know folk who seem to think it's ok to pop round and see a mate or two for a cuppa.
Cheap, and burns like feck giving off some of the most noxious fumes I've ever encountered.
Absolutely ridiculous building houses from it.
If you're gonna build a country house do it right, and don't scrimp on the build costs.
I doubt the massive mansions still standing had any polystyrene in...
My old 36 was written off because the panels and parts weren't available new anymore, they wouldn't do it with 2nd hand parts as they couldn't put the warranty on it.
So off it went.
I do try to avoid 90 degree to the tramlines though.
We don't have much drainage which is backfilled with beach so am reliant on getting into ditches or crossing the few which do have beach fill.
I go in between everytime.
So start at 7.5m spacing, then move over 2.5m each year until done.
Then shift to the side 1.25m and carry on at 2.5m spacing until the fields done, then shift in between again etc, etc .
I have a few fields now with moles every 62.5cm.
Having new moles at 7.5m isn't...
I mole every field every year.
But I do every third run so I have a fresh mole every year. It requires rtk, and a will to make a good job, and some extra management because you need to know where to mole each time.