We have a new section on our website displaying all available used plant for sale.
We are always interested in talking to owners considering sellers so please get in touch if you are interested in selling your biomass system on.
https://biomasssparesonline.co.uk/collections/clearance
Kind...
Hi, I'm a geography student at the University of York conducting a study on energy demand practices in relation to solar PV/solar thermal among other micro-renewable energy sources. I need people that have solar panels or other renewable energy installations in use at their home to help me by...
We have the following biomass boilers available for sale (but we are always looking for more):
1 x 199 kW Chip Boiler
1 x 200 kW Pellet Boiler
1 x 125 kW Pellet Boiler (Space heating)
1 x 500 kW Chip Boiler (Agricultural drying)
1 x 85 kW Pellet Boiler (Space heating)
2 x 500 kW Log Boilers (for...
We are looking for a 200 kW log (batch) boiler - Farm 2000 or similar.
Must be accredited for RHI, condition is NOT important, we will refurbish if necessary.
Please message me if you have anything suitable.
At Strand Energy we have had a record month with over £275,000 claimed (and paid) for our clients in outstanding RHI. If you (or your clients) are having problems with your RHI registration, accreditation or claims, please get in touch via [email protected] or on Linkedin. There's no...
Hi, we are looking to buy Biomass boilers that are pre-accredited for RHI. All types considered but we are really looking for 200 kW or above chip boilers. if you have a suitable boiler send me a message on here or mail [email protected]
We are looking for potential Buyer who need long term supply of Palm Kernel Shell (Biomass) kcal 2500-3800 if you need supply please email us : [email protected]
Thank you
Looking to buy a PTO drive wood chipper. Must be able to take timber up to 500mm diameter.
Can anybody recommend make or know of any for sale?
Also looking for a wood chip blower, open to ideas.
We had a 80KW heat exchanger (5ftx10ft) fitted up to our 120kw biomass boiler. Positioned in front of the tunnel fan. I trusted the Hetas plumber to select the right gear for the job.
Now Ive tried it and the heat it produces doesnt seem enough. Its not enough to make the boiler work hard and...
Hi,
We have a 100kw Wood chip boiler and buffer tank situated in an outbuilding. The building roof is just boarded with sarking boards and felting to stop water coming in.
Even though the buffer tank is lagged and the boiler is also in it supplied insulation and all pipework has the foil...
What happens when a biomass boiler system is not treated with protection when it is installed?
Thankfully most responsible installers do treat the new installations.
Here's a case study on a biomass boiler system that wasn't treated or protected and was performing inefficiently, and losing...
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.