wind turbine

  1. F

    DIY a frost protection wind machine

    Good afternoon everybody, I'm looking into starting a project. I want to build a wind machine to protect my orchard fields from frost damage. Those that are currently buyable are a lot-lot overpriced in my opinion. I'm looking into building a small fixed electronic first, to make all the...
  2. G

    Evoco, Proven and C&F Headswap’s

    Hi all We are currently providing costing’s for Headswap’s for the above machines. If you have any questions please don’t hesitate to PM me and I can give you some more information. Thanks
  3. G

    Gaia Wind Servicing & Parts

    Hi All Just a quick message to say if you need a service or any parts please don't hesitate to contact us on either our website or [email protected] We hope we can be of service Gaia
  4. C

    Micro-renewables university study

    Hi, I'm a geography student at the University of York conducting a study on energy demand practices in relation to solar PV/solar thermal among other micro-renewable energy sources. I need people that have solar panels or other renewable energy installations in use at their home to help me by...
  5. SpectrumEnergySystems

    Vestas Turbines DEIF Retrofit

    If you own a Vestas turbine, its lifetime can be extended by up to 20 years. This will save you money, and improve the overall performance of your turbine. Spectrum Wind are the official UK partners of DEIF. Our engineers are experts in the installation, maintenance and servicing of wind...
  6. G

    Gaia Wind(Green Energy Solutions) Back in Business

    I would like to let everybody know that all the assets and Intellectual Property (IP) of Gaia Wind have been acquired by a new owner and the company is now operating as Gaia Wind (Green Energy Solutions) Limited. We have been back and fully operational since July 2018. There are significant...
  7. I

    Wind Turbine Land Rental

    We are hoping to try and get a company to lease a brownfield site on our land before the tariff change next year. Has anyone got any recomendations or previous involvement ? 500kw to 2.5MW would be ideal. Thank you in advance.
Top