warksfarmer
Member
I'm after some prices for a lean to spec as below:
160' long, 28' wide (the width is quite critical due to space available), 20ft bays.
Eave height will end up around 18ft we think as the roof of the lean to will continue off the existing shed for another 28ft. Existing shed is 22ft eaves with a 12.5 degree roof pitch.
Wood purlins
Cladding on one end fully the opposite end will remain completely open.
Side cladding would be completely down the 160ft bar one personnel door and also a 40 single span opening which will need a bridging beam.
We need one dividing wall with 60 min fire protection running 28ft wide.
Price for complete concrete floor but also price for 80ft x 28ft of concrete as it may only be part concreted.
Price for kit and also erected price
Its currently a hardcore surface but it would need levelling and some stone which we would do ourselves.
Post code CV9
Looking for a something basic and bog standard. Nothing fancy required but timing is important as it would need to be up within a few weeks!
@RWG Contracts
@BobGreen
@Graham Heath Construction
@anyone else!
Thank you.
160' long, 28' wide (the width is quite critical due to space available), 20ft bays.
Eave height will end up around 18ft we think as the roof of the lean to will continue off the existing shed for another 28ft. Existing shed is 22ft eaves with a 12.5 degree roof pitch.
Wood purlins
Cladding on one end fully the opposite end will remain completely open.
Side cladding would be completely down the 160ft bar one personnel door and also a 40 single span opening which will need a bridging beam.
We need one dividing wall with 60 min fire protection running 28ft wide.
Price for complete concrete floor but also price for 80ft x 28ft of concrete as it may only be part concreted.
Price for kit and also erected price
Its currently a hardcore surface but it would need levelling and some stone which we would do ourselves.
Post code CV9
Looking for a something basic and bog standard. Nothing fancy required but timing is important as it would need to be up within a few weeks!
@RWG Contracts
@BobGreen
@Graham Heath Construction
@anyone else!
Thank you.