Right... Shed is up, so next stage is to get some quotes for a 4KW (not allowed any bigger so lets not have that discussion please) solar system to be installed on cement fibre roof.
Electric meter is in the same building so no complex wiring
Farm house is heated by biomass so I believe should get the relevant EPC rating
thanks
Alastair
Electric meter is in the same building so no complex wiring
Farm house is heated by biomass so I believe should get the relevant EPC rating
thanks
Alastair