- Location
- M6 Hard shoulder
All bots will be linked through t4c but physically it will be separate.Have you got the option of running all robots together down the line? What’s the reason for running late lactation cows on the new separate unit when TMR and nut through the robot is the same?
Training fresh heifers/cows is a doddle in existing shed plus we have a pen for fresh cows 24hrs post calving in existing shed. New shed will be no frills or fancy gate systems, just a crush for treating/dry offs.
Hopefully with it being staler cows it will require less labour to manage.
Didnt want 2 sheds that both needed fresh cows or training heifers.
It may be a disaster, time will tell