Forums
New posts
Forum list
Search forums
What's new
New posts
New resources
Latest activity
Trending Threads
Resources
Latest reviews
Search resources
FarmTV
Farm Compare
Search
Tokens/Searches
Calendar
Upcoming Events
Members
Registered members
Current visitors
New Resources
New posts
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Forum list
Search forums
Menu
Log in
Register
Navigation
Install the app
Install
More options
Contact us
Close Menu
Forums
Farm Building and Infrastructure
Renewable Energy
Biogas plant from Omni Heat and Power
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="mawleymoos" data-source="post: 8136394" data-attributes="member: 5570"><p>yes we have the chinese cummins engine (80kw) and deep sea controller! the origional engine done 24-24k hours and we decided to buy a complete spare engine as i hate down time! when the time came omni just swapped them over and we sent the engine away for a complete overhaul! the problem with a spare is that we kept nicking parts off it (turbo,sensors,manifold, altinator etc etc) and then had to gather everything up to make it useable!!! i am concerned about parasitic load as we generally run between 55-70kwhs (just cow slurry) but we only run the mixing pump (22kw) for 5 mins in 30! and that is only 8 hrs a day due to sulphur being a little high! there is another 15 kw pump at the rear which should be mixing as well, every 1/2 hr or so! but again, it is switched off at the moment!</p></blockquote><p></p>
[QUOTE="mawleymoos, post: 8136394, member: 5570"] yes we have the chinese cummins engine (80kw) and deep sea controller! the origional engine done 24-24k hours and we decided to buy a complete spare engine as i hate down time! when the time came omni just swapped them over and we sent the engine away for a complete overhaul! the problem with a spare is that we kept nicking parts off it (turbo,sensors,manifold, altinator etc etc) and then had to gather everything up to make it useable!!! i am concerned about parasitic load as we generally run between 55-70kwhs (just cow slurry) but we only run the mixing pump (22kw) for 5 mins in 30! and that is only 8 hrs a day due to sulphur being a little high! there is another 15 kw pump at the rear which should be mixing as well, every 1/2 hr or so! but again, it is switched off at the moment! [/QUOTE]
Insert quotes…
Verification
Post reply
Forums
Farm Building and Infrastructure
Renewable Energy
Biogas plant from Omni Heat and Power
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.
Accept
Learn more…
Top