Cap it with something else? Like what?If you put it down in the dry and cap it it forms a good yard or track but certainly not going to pay for it
Type 1 or Plainings.Cap it with something else? Like what?
It did come out as slurry and then separated solids like Cow slurry, so only fit to put back in the ground.The gang that put the new gas main under the Humber bored out hundreds of thousands of tons of chalk and dumped the lot ,,cost them more to loose it than use it
Good job then I didnt take up the offer of a few loads ,,I did some work for the tunnel manager and he asked me If I needed any free hardcore as it was all going to winterton tip to cap it .It did come out as slurry and then separated solids like Cow slurry, so only fit to put back in the ground.
They may have been talking about the 100's of thousands of tonnes of hardcore imported that is now being removed along with tarmac, it was like a 6 lane motorway was built across a 80 acre field, concrete crushers and power screens have been there for months now, along with a fleet of about 20 artics removing it.Good job then I didnt take up the offer of a few loads ,,I did some work for the tunnel manager and he asked me If I needed any free hardcore as it was all going to winterton tip to cap it .
If it was that runny ,it wouldnt have been any good
All that good stuff came out the quarry up the road ,ni on 500,000 tns went into making the approach road and landing area for the tunnel borer ,,its something like 10ft deep across the whole site,,Welton aggs were supplying 7 days a week to it from hibaldstow and then alot of blue limestone from the 4x4 ofroad quarry up the roadThey may have been talking about the 100's of thousands of tonnes of hardcore imported that is now being removed along with tarmac, it was like a 6 lane motorway was built across a 80 acre field, concrete crushers and power screens have been there for months now, along with a fleet of about 20 artics removing it.
The shame of it is the river bank flood defence (500m away) needs raising and is planned for the future, but non of this stuff was deemed suitable!All that good stuff came out the quarry up the road ,ni on 500,000 tns went into making the approach road and landing area for the tunnel borer ,,its something like 10ft deep across the whole site,,Welton aggs were supplying 7 days a week to it from hibaldstow and then alot of blue limestone from the 4x4 ofroad quarry up the road
Its not called Goxhill marsh for fun,,it horible in a dry time without getting floodedThe shame of it is the river bank flood defence (500m away) needs raising and is planned for the future, but non of this stuff was deemed suitable!
I know only too well, but there are still people who say DD will work anywhere, would love to show a photo of an attempt done this year, half flooded all drowned, but its a neighbors so better not.Its not called Goxhill marsh for fun,,it horible in a dry time without getting flooded