- Location
- Lincolnshire
Thanks guys I've got to have a serious think quickly then.
Don't want to rush it and then wish I'd designed it better as possibly want to house the mobile drier. So it maybe another year but i will be in touch of and when i do . Thankyou
Assuming the drier will be in the lean to, I would just go ahead, you should get the main shed complete with the lean to just roofed, then that would give you time if needed to design the lean to set up for next year.
If you look on mecmars website there are a few clever drier set ups to consider.