I know I have seen mention of one or two doing this, and a spot of advice would be useful.
I have been approached by Fisher German on behalf of STW, in relation to a project that might take place on a nearby Sewage Treatment plant. FG have sent me a letter asking for ownership details and also to fill in some online form survey as well as well as no doubt, dealing with FG into the future.
I went through a similar rigmarole 18 months ago with the same companies albeit on a different project, that ultimately was cancelled. My involvement was as this time, filling in paperwork, speaking with FG and contacting Agents etc etc..... Most of you will have been down this road I am sure.
I am a bit hacked off at the expectation that I will simply do as they ask.... no mention of recompense, and not even a hint of a thank you, based on previous experience...
Should I email back and say I will cooperate, but at a fixed rate. Say £25/letter or form? Similiar for each phone call or short meeting...?
Any suggestions folks?
I have been approached by Fisher German on behalf of STW, in relation to a project that might take place on a nearby Sewage Treatment plant. FG have sent me a letter asking for ownership details and also to fill in some online form survey as well as well as no doubt, dealing with FG into the future.
I went through a similar rigmarole 18 months ago with the same companies albeit on a different project, that ultimately was cancelled. My involvement was as this time, filling in paperwork, speaking with FG and contacting Agents etc etc..... Most of you will have been down this road I am sure.
I am a bit hacked off at the expectation that I will simply do as they ask.... no mention of recompense, and not even a hint of a thank you, based on previous experience...
Should I email back and say I will cooperate, but at a fixed rate. Say £25/letter or form? Similiar for each phone call or short meeting...?
Any suggestions folks?
Last edited: