Ordered concrete last Friday from local depo, for 2 o'clock today.
3.30 came and rang up to find out when it loaded and they said was loaded at 1.15. turned up in my yard at 4 (aka milking time). Driver very apologetic had long hold ups on a30. I scratched my head as the depo I ordered from is near camelford 20 miles from me, and no need to go near a30.
Then he said he came from different depo 50 miles away. Not his fault and he lent hand with shovel as we were man down due to milking. But concrete hardening quickly once out of lorry, he used all his water to keep it workable. What effect will this have on strength. The finish is ugly as it was very sticky when tamping and very hard work to level. What come back do I have now that have layed it. Need another 30cube to finish job.
3.30 came and rang up to find out when it loaded and they said was loaded at 1.15. turned up in my yard at 4 (aka milking time). Driver very apologetic had long hold ups on a30. I scratched my head as the depo I ordered from is near camelford 20 miles from me, and no need to go near a30.
Then he said he came from different depo 50 miles away. Not his fault and he lent hand with shovel as we were man down due to milking. But concrete hardening quickly once out of lorry, he used all his water to keep it workable. What effect will this have on strength. The finish is ugly as it was very sticky when tamping and very hard work to level. What come back do I have now that have layed it. Need another 30cube to finish job.