Trying to get my head around this . Surface area "Per metric ton" , so what rate of prilled would be needed to match a ground rate of 5ton a hec. Never used prilled so no idea on how much a ton even costs compared to a bulk wagon tipped for a lime spreader but surely the cost of a prilled product is going to be silly pounds £££££ .