- Location
- North Norfolk
Installing the machinery - heat exchanger at the back. Macerator replaced by Vogelsang machine as it has a much bigger stone trap. All four pumps are now gone, replaced by one piston pump, gravity and some gas/air lift.
Shed going over pumps
Installing the Trioliet mixer tub onto the Boerger power feeder. Now replaced by a Shelbourne tub and my own design of auger feeder
Installing the gas holder, inner grey holds the gas, outer green pressurised by air.
Carrier separator on stand behind now replaced by Sepcom
Building the biogas backup boiler in the CHP room from a kit
Shed going over pumps
Installing the Trioliet mixer tub onto the Boerger power feeder. Now replaced by a Shelbourne tub and my own design of auger feeder
Installing the gas holder, inner grey holds the gas, outer green pressurised by air.
Carrier separator on stand behind now replaced by Sepcom
Building the biogas backup boiler in the CHP room from a kit