My turbine was one of the last the get accredited for the FIT scheme.
We have approximately 400 metres of HV (11,000 volt underground 3 x 95mm) cable from the turbine RMU to our RMU near our farmstead.
Would it be feasable to install a re-manufactured 11,000V - 415V transformer at the farmstead RMU and would the lead/lag be correct for us to put the 415V direct into the BusBar on the farm side of the grid supply meters - We are at the end of a 11,000v 3 phase line for both our input and output. ?