Yep Farmer Roy will connect it to the pump his end if he can find some hose clips and some gaffer tapeAre you installing an underground irrigation system?
Yep Farmer Roy will connect it to the pump his end if he can find some hose clips and some gaffer tapeAre you installing an underground irrigation system?
Bryns a bit sunburnt this morning View attachment 1055888
far too good for one of yours !Who put that fence up? It looks like one of mine.
Pete's going to be in a proper huff with you showing favoritism like thatMade him a shade
Are you drilling for water?
Yea British airways phoned wanting air filters for their 747 do we have any in the stores?I’ll be surprised if you’re making as much dust as I am.
Dry rock being crushed for lime, no water in quarry lagoons to moisten it, I’ll bet Captain Kirk can see me from outer f**king space.
Is that a disc drill or the disc slots from your Tyne ,
Yea British airways phoned wanting air filters for their 747 do we have any in the stores?
why dont you damp it down abit ,save the dust ?20 minutes?? I don’t think that would be enough time to clear the dust!!
Why can’t you tip it in the sea to wet it??What, every job!?
We spread 1200t last week on 14 farms . That would take some doing.
What I have done is delivered half premium quality and half screened lime which is kept outside (so is moist) to some jobs. We then mix on site which is working well. Customers are happy with it.
The quarry that produces the premium ground lime have no water whatsoever in their lagoons, so have me way of damping it down a bit. It’s either produce dry lime or none at all.
Just like farming, they need rain.