What is the first steps to putting in a lagoo? Is it the council or EA we need to talk to?
What is the first steps to putting in a lagoo? Is it the council or EA we need to talk to?
I have recently contacted the EA and found them fantastic as I was promised a call back which I promptly had and was talked through the process very well in good detail.Is the soil sample a triaxle soil permeability test? Have contacted the EA multiply times with no success finding out exactly what soil test is needed before putting planning in. Thanks
I have recently contacted the EA and found them fantastic as I was promised a call back which I promptly had and was talked through the process very well in good detail.
I needed a soil sample taken from a mix of all four corners of the pit to a depth of one metre below the pit ground level tested for permeability by an independent lab. Then if yes are good or suitable clay can be imported from elsewhere planning can be done but the EA need to check construction and sign off 14 days before use. SSSI's may slow planning tho if applicable!!!!
That's great. Thanks!!Customer service line 03708506506View attachment 632754 View attachment 632756 View attachment 632760