Will be putting down about 10 inches of 2 to 3 inch stone. Then pouring a slab of concrete on top of this. I have about 100 tonne of the at one coming this week. What's the best way to get this as level as possible before vibrating roller comes in.
My plan was to scatter it with the loader bucket and use the land leveller but will I be a good bit off in places ?