Just been accepted into a mid tier scheme for 2020 to 2025. I've got to establish some nectar flower mixes on some land which was drilled with osr last autumn which, typically has survived the csfb onslaught better than the rest of the field.
Looking at the dates in the agreement it says to establish the mix between 15 April and 31 May or 15 july and 30 August. If I go for the later date does it mean that I can take the osr to harvest first and then drill the mix?
When I applied I was under the impression that I would have to rip the rape up if I was accepted into the scheme. I'm about to go through with kerb and I don't want to spray the area if it's got to come up in spring.
Looking at the dates in the agreement it says to establish the mix between 15 April and 31 May or 15 july and 30 August. If I go for the later date does it mean that I can take the osr to harvest first and then drill the mix?
When I applied I was under the impression that I would have to rip the rape up if I was accepted into the scheme. I'm about to go through with kerb and I don't want to spray the area if it's got to come up in spring.
Last edited: