We've taken on an extra 55 acres about 15 minutes from the yard. I had to load up some stock we had sold on Sunday and a 15-minute job turned into a 2-hour job when they wouldn't go into the trailer with a few hurdles around them. We do have a cattle handling forcing gate with a few hurdles that fits on a 3 point linkage but its semi-permanent in the yard.
Is there a design that I can do with some fence posts that gives me a single file run into a race? It will always be smaller stock up there between 4 and 15 months of age so not finishing stock or cows. Any ideas appreciated
Is there a design that I can do with some fence posts that gives me a single file run into a race? It will always be smaller stock up there between 4 and 15 months of age so not finishing stock or cows. Any ideas appreciated