I want to create a slatted feed passage with slurry channel underneath. It will be 60 feet long, 5 foot deep and 13 foot wide. Previously used blocks but find it takes too long. I was thinking 6" thick and 15 foot long and 5 foot high panel would be fastest way but does it last as long or will it leak maybe?