Is that for wind?6.85p with Opus inc benefits ex triad.
Fixed for 12 months.
Happy with that.
Actually did a good job for once !
6.85p with Opus inc benefits ex triad.
Fixed for 12 months.
Happy with that.
Actually did a good job for once !
I can’t get anywhere near that for 1.3 mw wind. When did you fix?
Believe the take £1 per mwh
Export market is being overhauled don’t lock in for more than 12 months.
Apologies for the novice questionI can’t get anywhere near that for 1.3 mw wind. When did you fix?
In what way or the market being overhauled? Genuine question
1.3mw (megawatt) is 1300 Kw (kilowatt) of total installed capacity (TIC). Effectively, that is the total amount of electricity the generator can produce in one hour. All the definitions are used as part of the Feed in Tariff (Fit) Schemes
I think it will be very wind dependent. The 1.3 Mw will be the max output , sadly the wind is very dependent on location.Thanks for that. So trebor07 would get an income of £780k based on him getting 6.85p per kWh?
Just checking in calculating correctly....nothing specific to trebor07
Thanks