Project Xerion.

At long last I’ve made a tentative start on the Xerion.

It’s been a long story of hassle and hold ups since I bought it in September and that shows no sign of letting up. Parts are desperately slow to arrive and to date, after ordering everything in early February the only things I’ve received are a tool box catch and a pair of headlights.

More bad news today, after being told the cab subframe would be here last week they are now saying mid May. That’s going to be cutting it very fine for me because I really need it mostly done by mid June before we start walking thousands of acres of standing crop.

Anyway, trying to keep on the up side, I’ve done a few bits and bobs. Had the new wheels and tyres fitted a while back. The old silver wheels and tyres are for sale if anybody wants a pair or one for a spare. Quite good tyres, easily capable of holding up a corner and keeping a tractor working for a day or two in the event of a tyre disaster. They are 710/60/42. I think! :D



CB2ABAC5-AA7B-443D-AC06-F3BB39AC2C81.jpeg
C57D2462-BCCE-4E0C-80FC-683370715CC5.jpeg
 
Master plan David is to shove the cab out front and lash the Bredal body on the back and go chucking dust up.

Simples. If I can get parts.

No real reasons why the delay, just desperately dragging their feet. I have a feeling somebody doesn't want me to show how easy it is to do.

Anyhow.............I have my people onto it. ;);)
 
No. Engine access looks a bit of a faff. But it won’t ever break down. :LOL::rolleyes:


Job for today, get the front and rear linkages off. Front links took twenty minutes. Christ, I’m good at this. Rear linkage taken 5 hrs so far and still not done!

These pins are seized in tight. No grease points anywhere.
85E9EE3A-A0B4-49AF-B394-C2DA02E172DC.jpeg


Had to make an extraction tool. Old knife coulter and a bit of tube. Luckily, the pins are the type with a threaded hole down the middle. They took some shifting but they did yield to my superior skills in the end.
07D8397C-02DA-4E2A-A7D6-E2AEB7FFCA83.jpeg


Linked the hydraulic pipes together to create a circuit.

Top pins won’t have it at all. Next job will be to take the whole top shaft off with rams attached. Bugger the pins.
 

davedb

Member
Location
Staffordshire
Quids in already. Found this spanner lurking on the top of the rear axle. View attachment 789184


Front links all gone. Planning on a nice stainless tool box here somewhere.
View attachment 789182

Losing the linkages to lose weight. I reckon over a quarter of a tonne easy.
Sounds like quite a simple frame to mount the cab then if no tipping involved will off been mear peanuts of claas I bet:whistle::D
 

SFI - What % were you taking out of production?

  • 0 %

    Votes: 101 41.4%
  • Up to 25%

    Votes: 89 36.5%
  • 25-50%

    Votes: 36 14.8%
  • 50-75%

    Votes: 5 2.0%
  • 75-100%

    Votes: 3 1.2%
  • 100% I’ve had enough of farming!

    Votes: 10 4.1%

May Event: The most profitable farm diversification strategy 2024 - Mobile Data Centres

  • 469
  • 0
With just a internet connection and a plug socket you too can join over 70 farms currently earning up to £1.27 ppkw ~ 201% ROI

Register Here: https://www.eventbrite.com/e/the-mo...2024-mobile-data-centres-tickets-871045770347

Tuesday, May 21 · 10am - 2pm GMT+1

Location: Village Hotel Bury, Rochdale Road, Bury, BL9 7BQ

The Farming Forum has teamed up with the award winning hardware manufacturer Easy Crypto Hunter and Easy Compute to bring you an educational talk about how AI and blockchain technology is helping farmers to diversify their land.

Over the past 7 years, Easy Crypto Hunter have been working with farmers, agricultural businesses, and renewable energy farms all across the UK to help turn leftover space into...
Top