- Location
- Lorette Manitoba
I’m add three more bins to my line of hopper bins. They are a little larger than the last ones and will hold close to 400 tons of wheat each. Pouring a pad 24 inches thick and doing 3/4 rebar two layers and on a foot grid. The last pads we poured were 18 inch thick and I place the rebar evenly. 6 down from top and 6 up from bottom. Any advice on how to position the bars. Kinda of a dumb question I know but would like to get the best possible pad strength. Site has been dug down to sub soil and packed with crushed concrete 10 inches deep.