Will Blackburn
Member
- Location
- Cheshire
We've got a 10ft deep 5000G tank and need to mix then pump slurry 200m along a 6" pipe to an above ground store. Any makes/models worth a look or avoiding?
electric or pto ?We've got a 10ft deep 5000G tank and need to mix then pump slurry 200m along a 6" pipe to an above ground store. Any makes/models worth a look or avoiding?
How many kw?Landia electric pumps is what i have
electric or pto ?
I know the feeling as we have the same issue here, id love my pto pump t give up and replace it with a leccy one but single phase and distance render it a non starterPTO, because I've been told that over that distance electric will struggle, so I guess my supply may be over stretched as well.
We have a slatted chanel system and we need to keep it flowing around the channels like a river I suppose. The original idea was to have a pump taking it from one end and pump it into the start to create the flow but I note on various websites that they also achieve the flow by using an electric agitator/propeller located in the base of the wall that separates the start from the end of the channel. Does anyone have this system and does it work?
@FergiemanWe have a slatted chanel system and we need to keep it flowing around the channels like a river I suppose. The original idea was to have a pump taking it from one end and pump it into the start to create the flow but I note on various websites that they also achieve the flow by using an electric agitator/propeller located in the base of the wall that separates the start from the end of the channel. Does anyone have this system and does it work?
We have a slatted chanel system and we need to keep it flowing around the channels like a river I suppose. The original idea was to have a pump taking it from one end and pump it into the start to create the flow but I note on various websites that they also achieve the flow by using an electric agitator/propeller located in the base of the wall that separates the start from the end of the channel. Does anyone have this system and does it work?
so you have a hole in the wall between the start & finish chanNelson and the propeller fits into the hole?There is 4 full length channels and the shed 140' long running from 1 propeller.
It is a PTO propeller and we have to put it everytime we want to mix, they recommend every 3 weeks but in reality its not done as often as that!
so you have a hole in the wall between the start & finish chanNelson and the propeller fits into the hole?
Our design does not allow us the space to do that so we were thinking of putting in a submersible electric propeller, we have three phase.