RWG Contracts
Member
- Location
- Samlesbury, Lancashire
off set the channel to the same line as inside of gable posts ,leave 15mm clearance to get side panels behind channel ,finish the gable post half on the gable post you will have room to put angle on to carry door track it will impede opening by about 30mm if you using 100mm wind lock guide
Like that?