biggles
Member
- Location
- derbyshire
Have just poured a concrete slab and want to install concrete panels onto it and seal them , how long does the concrete need to cure for before the sealant will work correctly? Cheers
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
It won’t be driven on for a long time, just want to stand the panels in between the stanctions and seal them, this can be done from the un concreted area, the new pad will only be taking the weight of the panels, cheers7 days before the chemicals have gone off I the concrete, no more reaction and no green appearance
28 days+ before I'd put a hiab lorry over it with a load of panels on the back
With most sealants you will need to wait 21-28 days for moisture to evaporate out of concrete. That’s based on 6 inch slab.It won’t be driven on for a long time, just want to stand the panels in between the stanctions and seal them, this can be done from the un concreted area, the new pad will only be taking the weight of the panels, cheers