aye turned out well 100 by 40 to start next week how long wud you leave a silage pit before putting grass in it???
aye turned out well 100 by 40 to start next week how long wud you leave a silage pit before putting grass in it???
28 days is the official time I thought - when the concrete has reached 90% of its design level.I always say 2 weeks but the longer the better really
28 days is the official time I thought - when the concrete has reached 90% of its design level.
28 days is the official time I thought - when the concrete has reached 90% of its design level.
Something tells me Rob's customers probably only called him to do the job 28 days before they started silaging.
Did you get the job of relaying it (again)?I remember doing one, patching up half his clamp, and we was pouring at same time they were mowing. Farmer promised me they where filling other clamp not the one we was concreting, I don't think I need to tell you what happened
Did you get the job of relaying it (again)?
how hi was it
Try a firm called Harsco. Only problem is it's a two week minimum hireAnybody know how much shutters are to hire, got 85m of 2ft wall including 2 corners (silage pit) to do in the next fortnight.
Tried to get a rough guide from peri and A plant but they want an application for a credit account before quoting ffs.