Silage Clamp

SJM

Member
Currently have a planning application in for a 40x15x3.5m silage clamp and am considering shuttering the walls. Based in the Midlands

What thickness of wall would people recommend? Would we need to put steels in it? Would prefer not to because of the silage effluent. There would be 332.5 m2 of wall which, if we went 300mm thick, would be 100 cube of concrete.

Anyone be able to give an estimate of what it might cost?

Will also be laying 780m2 of floor including an apron in front of the clamp.

Thanks
 

SJM

Member
Priced up vertical cantilevers and L shaped ones. Both types need a huge amount of concrete to install them (apparently) so was wondering how comparative shuttering is
 

SJM

Member
We use the L shaped panels and they don't need huge amounts of concrete to install.

Presume you lay a thin layer to get the level right? The panel companies were all recommending a 150mm deep plinth of meshed concrete under the panels and then concreting over the foot too
 

Fraserb

Member
Location
Scottish Borders
Presume you lay a thin layer to get the level right? The panel companies were all recommending a 150mm deep plinth of meshed concrete under the panels and then concreting over the foot too

We lay 100mm of concrete without mesh under them to get level correct, set the panels in place, tie them together with rebar and concrete up to the foot not over it, that's the way we were told to do it and done a few now no problems.
 

SJM

Member
We lay 100mm of concrete without mesh under them to get level correct, set the panels in place, tie them together with rebar and concrete up to the foot not over it, that's the way we were told to do it and done a few now no problems.

Thanks for that. Are these L panels with a full precast foot or panels with rebars sticking out of the foot to tie into the floor mesh? Been quoted both and quite a price difference!
 

S J H

Member
Livestock Farmer
Location
Bedfordshire
We lay 100mm of concrete without mesh under them to get level correct, set the panels in place, tie them together with rebar and concrete up to the foot not over it, that's the way we were told to do it and done a few now no problems.

How much hardcore do you have under the 100mm of concrete @Fraserb ? And how far do you extend it past the edge of the panel?
 

Fraserb

Member
Location
Scottish Borders
Thanks for that. Are these L panels with a full precast foot or panels with rebars sticking out of the foot to tie into the floor mesh? Been quoted both and quite a price difference!

Ours have a foot of concrete sticking out approx 500mm then 1m of rebar sticking out of that.

Not the best of pics but you can almost see them in the pics
5925572A-8EB9-409D-8FE7-4B61CB87C13D-45803-000039300E5FBC71_zpsdda28fde.JPG
ABD856DA-95BA-4ACB-AFBA-383CE1E8697B-45803-000039302104779E_zps4e5375c3.JPG
 

SFI - What % were you taking out of production?

  • 0 %

    Votes: 102 41.5%
  • Up to 25%

    Votes: 90 36.6%
  • 25-50%

    Votes: 36 14.6%
  • 50-75%

    Votes: 5 2.0%
  • 75-100%

    Votes: 3 1.2%
  • 100% I’ve had enough of farming!

    Votes: 10 4.1%

May Event: The most profitable farm diversification strategy 2024 - Mobile Data Centres

  • 871
  • 13
With just a internet connection and a plug socket you too can join over 70 farms currently earning up to £1.27 ppkw ~ 201% ROI

Register Here: https://www.eventbrite.com/e/the-mo...2024-mobile-data-centres-tickets-871045770347

Tuesday, May 21 · 10am - 2pm GMT+1

Location: Village Hotel Bury, Rochdale Road, Bury, BL9 7BQ

The Farming Forum has teamed up with the award winning hardware manufacturer Easy Compute to bring you an educational talk about how AI and blockchain technology is helping farmers to diversify their land.

Over the past 7 years, Easy Compute have been working with farmers, agricultural businesses, and renewable energy farms all across the UK to help turn leftover space into mini data centres. With...
Top