Solar Inverter Issues

Horn&corn

Member
Our 28kw roof System is showing drop on output on a couple of strings sometimes. Showing full power when it’s dull but at mid day a couple drop down to About half Output. Any ideas or recommendations on someone to look at it?
Abb Trio inverter
north Wiltshire
 

Attachments

  • 1506E5E3-4E4E-4DDE-A52B-2CA2321AC829.jpeg
    1506E5E3-4E4E-4DDE-A52B-2CA2321AC829.jpeg
    163.3 KB · Views: 0

Chickcatcher

Member
Mixed Farmer
Location
SG9
I am also having issues 3 inverters work and then dont work "SMA" investigating further thanks to a "Smart" meter we have seen today voltages on the 3 phases varying over 30% L1 270, L2 260 and L3 200, volts Ukpower network on there way. perhaps a bit far for you but there is BeBa based at Hemel Hempstead.
 

Exfarmer

Member
Location
Bury St Edmunds
You certainly need some string testing done. I would be worried about the MC4 connectors.
Other issues have you checked the max voltage experienced tp by the system on the gris side.
We have had huge problems on one site where the grid voltage on one phase went up to over 300 volts.
I believe this was due to a nearby large PV which was on only on single phase. I have no idea how they got permission to build it.
 

Deereone

Member
Livestock Farmer
Location
Dorset
This problem occurs when another PV system supplying the same transformer is set up to push slightly more into the grid than your system leaving your system to cut out until their exported voltage drops enough to allow yours to fire up again. I blame the buyers for allowing more suppliers to 'feed in' than the system can take.
 

Chickcatcher

Member
Mixed Farmer
Location
SG9
All sorted by UK Power neutral attachment close to the transformer was hardly hanging together by a thread. the connection described by the engineer as pretty poor. It had been there for around 30 years.
 

nonemouse

Member
Mixed Farmer
Location
North yorks
What is minimum grid voltage the the power network has to supply? We have a 20kw solar system on single phase that’s been working for the last 9 years. The last couple of weeks we’ve been having problems of our inverters not powering up (say waiting for grid voltage) our supply voltage seems very erratic, lowest I’ve seen this morning is 218volts.
 

Exfarmer

Member
Location
Bury St Edmunds
What is minimum grid voltage the the power network has to supply? We have a 20kw solar system on single phase that’s been working for the last 9 years. The last couple of weeks we’ve been having problems of our inverters not powering up (say waiting for grid voltage) our supply voltage seems very erratic, lowest I’ve seen this morning is 218volts.
I would guess they have had issues elsewhere with over voltage on that phase, so they have turned the taps down. I expect your inverter is calibrated too high .
Probably worth speaking to Local Network operator about the low voltage, but it is with in the allowable parameters
 

SFI - What % were you taking out of production?

  • 0 %

    Votes: 103 40.6%
  • Up to 25%

    Votes: 93 36.6%
  • 25-50%

    Votes: 39 15.4%
  • 50-75%

    Votes: 5 2.0%
  • 75-100%

    Votes: 3 1.2%
  • 100% I’ve had enough of farming!

    Votes: 11 4.3%

May Event: The most profitable farm diversification strategy 2024 - Mobile Data Centres

  • 1,318
  • 23
With just a internet connection and a plug socket you too can join over 70 farms currently earning up to £1.27 ppkw ~ 201% ROI

Register Here: https://www.eventbrite.com/e/the-mo...2024-mobile-data-centres-tickets-871045770347

Tuesday, May 21 · 10am - 2pm GMT+1

Location: Village Hotel Bury, Rochdale Road, Bury, BL9 7BQ