Forums
New posts
Forum list
Search forums
What's new
New posts
New resources
Latest activity
Trending Threads
Resources
Latest reviews
Search resources
FarmTV
Farm Compare
Search
Tokens/Searches
Calendar
Upcoming Events
Members
Registered members
Current visitors
New Resources
New posts
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Forum list
Search forums
Menu
Log in
Register
Navigation
Install the app
Install
More options
Contact us
Close Menu
Forums
Farm Building and Infrastructure
Renewable Energy
solar panel wiring checks / repairs
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="Bruce Almighty" data-source="post: 7993732" data-attributes="member: 297"><p>We've had them cleaned twice in the last 12 months, having never cleaned them before.</p><p>The building they are on was built in 1998 with a fibre cement roof. (Landini)</p><p>In 2011 we had to remove the fibre cement sheets to replace the Z purlins for deeper/ stronger ones as advised by the structural engineer.</p><p>Initially they were ground mounted as GreenEarth couldn't get the Schletter frames to fit them to the roof, but we were installed just in time before the FIT halved. We moved them onto the roof about 3 months later.</p><p>The inverters are Sunny Tri Power/SMA (I think ?)</p><p>We had a system fitted to the inverters which gives us a daily production report by email, about 6 months ago. But I don't have much faith in the man that installed it.</p></blockquote><p></p>
[QUOTE="Bruce Almighty, post: 7993732, member: 297"] We've had them cleaned twice in the last 12 months, having never cleaned them before. The building they are on was built in 1998 with a fibre cement roof. (Landini) In 2011 we had to remove the fibre cement sheets to replace the Z purlins for deeper/ stronger ones as advised by the structural engineer. Initially they were ground mounted as GreenEarth couldn't get the Schletter frames to fit them to the roof, but we were installed just in time before the FIT halved. We moved them onto the roof about 3 months later. The inverters are Sunny Tri Power/SMA (I think ?) We had a system fitted to the inverters which gives us a daily production report by email, about 6 months ago. But I don't have much faith in the man that installed it. [/QUOTE]
Insert quotes…
Verification
Post reply
Forums
Farm Building and Infrastructure
Renewable Energy
solar panel wiring checks / repairs
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.
Accept
Learn more…
Top