Forever Fendt
Member
- Location
- Derbyshire
Playing a waiting game this morning work just gone in acid tank for 1.5 hrs to remove all rust ect before being dipped the galvanise bath holds 630 tons of molten zinc and zinc is £2200 per ton £1.3m to fill from empty
Last edited: