Hi,
I have a 3 meter Rapid that i run on a Fendt 516 with RTK. I measured the width of the machine from outer disc to outer disc to 288 cm, so that leaves 6 cm on each to to the next pass for a total of 12 cm between passes. I tried measuring as i drilled, but clearly i havent been careful, because i now see that the machine is pulling 4-5 cm to the left. That leaves an overlap on the left side, and a gap on the right (the gap is abount 20 cm, so 4 cm too much to he left on each pass). Running 3 meter waylines, but the machine going 4 cm off to the left, how do i adjust that setting-wise? Do i use the centre-distance for the rapid-implement-setting? 1,54 m here would be correct?
I have a 3 meter Rapid that i run on a Fendt 516 with RTK. I measured the width of the machine from outer disc to outer disc to 288 cm, so that leaves 6 cm on each to to the next pass for a total of 12 cm between passes. I tried measuring as i drilled, but clearly i havent been careful, because i now see that the machine is pulling 4-5 cm to the left. That leaves an overlap on the left side, and a gap on the right (the gap is abount 20 cm, so 4 cm too much to he left on each pass). Running 3 meter waylines, but the machine going 4 cm off to the left, how do i adjust that setting-wise? Do i use the centre-distance for the rapid-implement-setting? 1,54 m here would be correct?