Would you build a house at the moment

Sharpy

Member
Livestock Farmer
Our planning permission runs out in 3 months.
We've been waiting 12 months for a builder.
Quote has increased from £200k to £280k.
Funds are sort of organised.
Little choice really. :(
Make a start, ie dig a foundation, lay in some drainage etc, once the job has started you have activated the permission, you might take a while to finish though......
 

Kidds

Member
Horticulture
They've altered the wording on it and it needs to be finished by.....
Class Q?
It has always said that for class Q. To be completed within 3 years of the planning being passed IIRC. We have successfully extended on more than one occasion and it is also relatively easy to get full planning if it does become an issue. (done that too)
 

S J H

Member
Livestock Farmer
Location
Bedfordshire
I’d make a start, I can’t see things dropping much to make a difference. Might be some deals to be had if you’re not in rush, but I think anyone good will alway be busy.
 

Old Tup

Member
Amazing the amount of stuff that is no longer available…from Russia etc due to War.
Timber supplies reduced to zero…etc etc.
Need to be acquiring materials etc well in advance even if it means putting in store.
Far end of the build things like Cookers….etc can virtually unavailable at the moment….lot of electronics come out of the Ukraine or at least parts for them did….
Not vital for the build but sort of thing that can slow things down badly..
 

S J H

Member
Livestock Farmer
Location
Bedfordshire
Amazing the amount of stuff that is no longer available…from Russia etc due to War.
Timber supplies reduced to zero…etc etc.
Need to be acquiring materials etc well in advance even if it means putting in store.
Far end of the build things like Cookers….etc can virtually unavailable at the moment….lot of electronics come out of the Ukraine or at least parts for them did….
Not vital for the build but sort of thing that can slow things down badly..
Timber isn’t unavailable, there’s a levy on it from russia, but most building timber will be from Scandinavia.
 
Last edited:

cattleman123

Member
Location
devon
Make a start, ie dig a foundation, lay in some drainage etc, once the job has started you have activated the permission, you might take a while to finish though......
All started footings in last year...intention to carry on building...but as already said thinking of holding off for 12mths
 

SFI - What % were you taking out of production?

  • 0 %

    Votes: 102 41.6%
  • Up to 25%

    Votes: 89 36.3%
  • 25-50%

    Votes: 36 14.7%
  • 50-75%

    Votes: 5 2.0%
  • 75-100%

    Votes: 3 1.2%
  • 100% I’ve had enough of farming!

    Votes: 10 4.1%

May Event: The most profitable farm diversification strategy 2024 - Mobile Data Centres

  • 646
  • 2
With just a internet connection and a plug socket you too can join over 70 farms currently earning up to £1.27 ppkw ~ 201% ROI

Register Here: https://www.eventbrite.com/e/the-mo...2024-mobile-data-centres-tickets-871045770347

Tuesday, May 21 · 10am - 2pm GMT+1

Location: Village Hotel Bury, Rochdale Road, Bury, BL9 7BQ

The Farming Forum has teamed up with the award winning hardware manufacturer Easy Crypto Hunter and Easy Compute to bring you an educational talk about how AI and blockchain technology is helping farmers to diversify their land.

Over the past 7 years, Easy Crypto Hunter have been working with farmers, agricultural businesses, and renewable energy farms all across the UK to help turn leftover space into...
Top