555's latest activity

  • 5
    555 replied to the thread G99 Forms -.
    That’s what I assumed , they can’t or won’t. We are installing the boiler and ORC , but not the connection to Grid, so need a third...
  • 5
    555 replied to the thread G99 Forms -.
    Thanks , it’s a new application.
  • 5
    555 posted the thread G99 Forms - in Renewable Energy.
    Anyone know of anyone who can complete these G99 forms for the DNO?
  • 5
    555 replied to the thread CO level in flue gas.
    AS Wilber said you need be to Hetas registered, and the NO level as per your emissions certificates, how ever the emissions read out is...
  • 5
    You would be on the commercial tariff, as you are heating several buildings, house and cottages. But your figures show the cost benefit...
  • 5
    We are, but much larger capacity now - Big set up going in shortly with ORC electrical production. We have never really supplied less...
  • 5
    Biomass does make sense if you have a big enough heat demand previously using oil. 1Mw biomass - 4000hrs (full load) annually -...
  • 5
    So part of the £110k is paying for the remainder of the RHI that the original set up had, so the longer left the more value it will...
  • 5
    555 replied to the thread Biomass boiler servicing.
    Although there is no pass or fail on the emissions at present I would expect it to be below or at the same level as the RHI emissions...
  • 5
    555 replied to the thread Electric car.
    The Tiguan was a bad choice of vehicle for the job it was bought for. The E up was a real wild card for a replacement as electric was...
  • 5
    555 replied to the thread Electric car.
    City driving, weekly average was around 27mpg - charging, all at home 3 pin socket, is at 7p per kw getting 5 miles per kw. Lease at...
  • 5
    555 replied to the thread Electric car.
    My wife has a small electric car, on lease. VW Eup. The cost of the lease, maintained, and the electricity, low rate overnight charging...
  • 5
    555 replied to the thread Hetas annual certification.
    The only limitations are if the service engineer has signed up and paid the individual fee for the 3 sizes of boiler - Kw duty - Small...
  • 5
    555 replied to the thread Biomass boiler servicing.
    Any HETAS registered service engineer can service any boiler, An emissions test has to be carried out and the results kept by the...
  • 5
    555 replied to the thread Combined Heat and Power..
    We have several set ups in the UK using High Temp Linka boilers, upto 160 deg C, coupled to an ORC unit. Power production is approx. 10%...
Top