grainboy
Member
- Location
- Bedfordshire
what capacity and height is the 1st elevator?
message me the details when you find out, no rushWill check
what a waste, what sort of value would you put on a frame like that?Was sent these pictures today,
Chopped up into a bin, sacrilege,
View attachment 1158454View attachment 1158455
Ah but its going off to be recycled so no doubt a developer can tick a sustainability box somewhere. Thats all that really matters in todays world. So its all fine reallywhat a waste, what sort of value would you put on a frame like that?
But is reusing the thing not the ultimate recycling as no energy required to melt it down again?Ah but its going off to be recycled so no doubt a developer can tick a sustainability box somewhere. Thats all that really matters in todays world. So its all fine really
A minor detail box tickers don't consider sadly.But is reusing the thing not the ultimate recycling as no energy required to melt it down again?
Well we know that. But I’m sure when it comes to ticking boxes it makes no difference. Our local EMR used to have a section where they picked out good steel sections & you could go in & buy. Generally brand new steel left over from developments etc. Priced somewhere between scrap & new steel. Everyone was a winner. I imagine the safety elf put a stop to it.But is reusing the thing not the ultimate recycling as no energy required to melt it down again?
what a waste, what sort of value would you put on a frame like that?
What size?We did put in an offer,
Frame and purlins, I’d have wanted £35k to £40k
At a gess, 90x60 feet just looking at photo.What size?
Way biggerAt a gess, 90x60 feet just looking at photo.
120’ x120’ counting the purlins and 6 bays at 20’Way bigger