Search results

  1. C

    Timber Framed Portal Building

    yep piccies here:
  2. C

    Timber Framed Portal Building

    Hi all - we have a 27m x 10m x 4m timber framed 3 bay portal building that we have permission to demolish ahead of a new house build. It was built in 2006 and is in what appears good condition. I can see lots of adverts for second hand steel framed buildings, but struggling to find anyone...
  3. C

    Planning Applications, PD and the like (General Chat)

    @Kidds , @George from SJM Planning - thanks both - yep I think cracking on is the best action - I would hope that there'd be a little pragmatism and leeway if we were that close - but good point on making it habitable - I think requirements there are working toilet and kitchen and as long as...
  4. C

    Planning Applications, PD and the like (General Chat)

    Thanks very much for the quick response George - wish banks etc had been this quick !! Assuming an optimistic 10 month build means we need to start now, realistically I think an October / November start date is more realistic meaning it could be 3 months late, perhaps up to 6. I would really...
  5. C

    Planning Applications, PD and the like (General Chat)

    Hi all, quick question on Class Q, I have bought a barn and 10 acre meadow. The purchase has taken far longer than expected because of covid, solicitors and banking staff being furloughed / work from home. What I expected to take 4 months has actually taken just over 10. Naively I thought...
Top