Just my take on it, I stand to be corrected….I think it’s on points total, on my last grant, I added some low cost items, that were high scores to bump up my overall score. I do wonder if farm size and employees has any impact …..
Score based I think, it’s averaged out, so say you were looking at 1 item at a score of 50 …or looking at two items, one at 50, and one at 71, your score would be 60.5.
I personally would risk not playing by the rules….had a check on a dribble bar through the grant….was here in an hour of the phone call…I was happy enough for visit as everything was in order ….
Watching the dairy cows starting to use the new swing brush I installed…..very wary of it to start with , but could watch them for hours getting to those itchy bits…..I’d nearly set up a cow brush webcam……
Have a dump trailer that needs the equaliser between the axle changed ….it’s running on ROR axles….I’ve new bits coming….any tips on how to do the job , or the best quickest way…..thanks
Have a dump trailer that needs the equaliser between the axle changed ….it’s running on ROR axles….I’ve new bits coming….any tips on how to do the job , or the best quickest way…..thanks
Thanks, sounds like you take the top off then things start jumping out all over the place....can just picture myself , hands and knees on the floor looking for bits
I have Kuhn plough on h4 mouldboard, looking to upgrade to one that has a deeper by 40/50mm and marginally short board, newer plough, is this most likely the L board? Does it have similar characteristics but leave a wider furrow bottom?
I could do with advice on lintel design that building regs are wanting on a single storey extension we have built. Wanting to know exactly what they require....PM if you can help, saves clogging up the thread. Thanks in advance
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.