Forums
New posts
Forum list
Search forums
What's new
New posts
New resources
Latest activity
Trending Threads
Resources
Latest reviews
Search resources
FarmTV
Farm Compare
Search
Tokens/Searches
Calendar
Upcoming Events
Members
Registered members
Current visitors
New Resources
New posts
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Forum list
Search forums
Menu
Log in
Register
Navigation
Install the app
Install
More options
Contact us
Close Menu
Forums
Farm Building and Infrastructure
Renewable Energy
Accelerated Loss of Mains Change Programme
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="farmerste" data-source="post: 7221920" data-attributes="member: 159"><p>received an email today from electricity north west regarding the accelerated loss of mains change programme and it says it covers everyone from 10 Kw upwards</p><p>Copied from the email ; </p><p><span style="color: rgb(44, 130, 201)">The criteria for those generators required to upgrade their systems encompasses every form of generation connected to the grid that has a capacity of between approximately 10kW – equivalent to a medium sized, non-domestic, rooftop solar array – and up to 50MW – equivalent to large scale commercial generation. Many types of generators need to comply from farmers with turbines to schools with rooftop solar.</span> </p><p> so unsure if my 30Kv solar needs to be done or not</p></blockquote><p></p>
[QUOTE="farmerste, post: 7221920, member: 159"] received an email today from electricity north west regarding the accelerated loss of mains change programme and it says it covers everyone from 10 Kw upwards Copied from the email ; [COLOR=rgb(44, 130, 201)]The criteria for those generators required to upgrade their systems encompasses every form of generation connected to the grid that has a capacity of between approximately 10kW – equivalent to a medium sized, non-domestic, rooftop solar array – and up to 50MW – equivalent to large scale commercial generation. Many types of generators need to comply from farmers with turbines to schools with rooftop solar.[/COLOR][COLOR=rgb(97, 189, 109)] [/COLOR] so unsure if my 30Kv solar needs to be done or not [/QUOTE]
Insert quotes…
Verification
Post reply
Forums
Farm Building and Infrastructure
Renewable Energy
Accelerated Loss of Mains Change Programme
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.
Accept
Learn more…
Top