Forums
New posts
Forum list
Search forums
What's new
New posts
New resources
Latest activity
Trending Threads
Resources
Latest reviews
Search resources
FarmTV
Farm Compare
Search
Tokens/Searches
Calendar
Upcoming Events
Members
Registered members
Current visitors
New Resources
New posts
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Forum list
Search forums
Menu
Log in
Register
Navigation
Install the app
Install
More options
Contact us
Close Menu
Forums
Farm Business
Agricultural Matters
Demand for Wayleave for fibre broadband cable installation
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="Andy26" data-source="post: 4839716" data-attributes="member: 199"><p>We too had the same wayleave letter as they have laid or are about to lay circa 800m of Fibre on the Farm (of no benefit to us as we could be served from the main cable being laid in the major trunk road that splits the Farm).</p><p></p><p>After much persistence we got a surveyor from Gigaclear to do a site visit and we agreed a route that would cause as minimum disturbance as possible both during installation and in the future. There is a clause that they will move it if development requires.</p><p>It is a major asset having Fibre to the premises, are you getting a connection [USER=5961]@Henarar[/USER] ?</p></blockquote><p></p>
[QUOTE="Andy26, post: 4839716, member: 199"] We too had the same wayleave letter as they have laid or are about to lay circa 800m of Fibre on the Farm (of no benefit to us as we could be served from the main cable being laid in the major trunk road that splits the Farm). After much persistence we got a surveyor from Gigaclear to do a site visit and we agreed a route that would cause as minimum disturbance as possible both during installation and in the future. There is a clause that they will move it if development requires. It is a major asset having Fibre to the premises, are you getting a connection [USER=5961]@Henarar[/USER] ? [/QUOTE]
Insert quotes…
Verification
Post reply
Forums
Farm Business
Agricultural Matters
Demand for Wayleave for fibre broadband cable installation