Forums
New posts
Forum list
Search forums
What's new
New posts
New resources
Latest activity
Trending Threads
Resources
Latest reviews
Search resources
FarmTV
Farm Compare
Search
Tokens/Searches
Calendar
Upcoming Events
Members
Registered members
Current visitors
New Resources
New posts
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Forum list
Search forums
Menu
Log in
Register
Navigation
Install the app
Install
More options
Contact us
Close Menu
Forums
Regenerative Agriculture and Direct Drilling
Regen Ag General Discussion
Regen Ag Introductions
New to strip till
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="Rainmaker" data-source="post: 1419086" data-attributes="member: 22022"><p>Thank you for the reply, interesting stuff.</p><p>I were speaking to one of the first all no-till arable farmers (using a cross-slot drill) in our area the other week about lime.</p><p>He was saying he has found on his thin stony silt the lime works it's way down in time with the worms/irrigation but there are different PH layers in the profile for some time unlike working it in with a Sunflower a few times.</p><p></p><p>Bit of a side topic..... do you feel if one were too variable rate spread lime on land with ph up and down like a roller coaster the heavy application areas that ended up with 3 tonne/ha or the likes would force a guys hand to mix/till it in well just to re set the ledger before going down the road you have?</p></blockquote><p></p>
[QUOTE="Rainmaker, post: 1419086, member: 22022"] Thank you for the reply, interesting stuff. I were speaking to one of the first all no-till arable farmers (using a cross-slot drill) in our area the other week about lime. He was saying he has found on his thin stony silt the lime works it's way down in time with the worms/irrigation but there are different PH layers in the profile for some time unlike working it in with a Sunflower a few times. Bit of a side topic..... do you feel if one were too variable rate spread lime on land with ph up and down like a roller coaster the heavy application areas that ended up with 3 tonne/ha or the likes would force a guys hand to mix/till it in well just to re set the ledger before going down the road you have? [/QUOTE]
Insert quotes…
Verification
Post reply
Forums
Regenerative Agriculture and Direct Drilling
Regen Ag General Discussion
Regen Ag Introductions
New to strip till
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.
Accept
Learn more…
Top