Forums
New posts
Forum list
Search forums
What's new
New posts
New resources
Latest activity
Trending Threads
Resources
Latest reviews
Search resources
FarmTV
Farm Compare
Search
Tokens/Searches
Calendar
Upcoming Events
Members
Registered members
Current visitors
New Resources
New posts
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Forum list
Search forums
Menu
Log in
Register
Navigation
Install the app
Install
More options
Contact us
Close Menu
Forums
Farm Building and Infrastructure
Buildings & Infrastructure
Outdoor silage pit designs.
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="Rimjob" data-source="post: 2585838" data-attributes="member: 687"><p>Originally a sleeper wall, then had to have bracing all the way round as was leaning. Was re done with 12" girders sunk 4' into the ground in 15' bays and shuttered 14' high. (All done by the farmers themselves)</p><p>Did 10 yrs like this but in the last couple had shown signs of movement, breaking point was going 30' high with 2 loadalls and a tractor on the clamp while a self propelled and 2 forage wagons hammered on the grass [emoji15]</p><p>Now sites been cleared bar the floor, 60m3 of concrete as a ring beam for one side wall and the back wall with 14' high l panels set into it and l bar/ double meshed into the floor.</p></blockquote><p></p>
[QUOTE="Rimjob, post: 2585838, member: 687"] Originally a sleeper wall, then had to have bracing all the way round as was leaning. Was re done with 12" girders sunk 4' into the ground in 15' bays and shuttered 14' high. (All done by the farmers themselves) Did 10 yrs like this but in the last couple had shown signs of movement, breaking point was going 30' high with 2 loadalls and a tractor on the clamp while a self propelled and 2 forage wagons hammered on the grass [emoji15] Now sites been cleared bar the floor, 60m3 of concrete as a ring beam for one side wall and the back wall with 14' high l panels set into it and l bar/ double meshed into the floor. [/QUOTE]
Insert quotes…
Verification
Post reply
Forums
Farm Building and Infrastructure
Buildings & Infrastructure
Outdoor silage pit designs.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.
Accept
Learn more…
Top