- Location
- Forfar,Angus,Scotland
Being covered overnight and space heaters all round.
Turbine was put up yesterday in not ideal conditions but the EWT team and crane boys were terrific,towers arrived onsite at 9.00am,turbine finished at 8.00pm after a 2 hr stop in the afternoon because of high winds,can't praise them enough and amazing to watch.View attachment 131778 View attachment 131780 View attachment 131782 View attachment 131784 View attachment 131786 View attachment 131788 View attachment 131790 View attachment 131792 View attachment 131794
BOP done by various,all local contractors,one for roads and crane pad,one for the turbine base.etc,etc,we have put a lot of money back into the local area unlike the nimbys would have people beleive.Well done! Civils works look to have been done to a high standard. Who is the BOP contractor?
BOP done by various,all local contractors,one for roads and crane pad,one for the turbine base.etc,etc,we have put a lot of money back into the local area unlike the nimbys would have people beleive.
Congratulations. I have just logged into this thread and thumbed through it all with great interest. Well done, it looks very impressive. We have one exactly the same less than a mile from here and it looks fantastic. I am sure you will be pleased with it and I hope the wind blows you loads a money !!! I will keep my eye out for further posts. Brilliant.Yes Locogen did,but we made the final decisions on which contractors to use.