Tha Ulsterscot
Member
- Location
- Greyabbey Co. Down.
Sort of whitewash, 1/2 hydrated lime and 1/2 Snowcrete. The building are in line to be re-done this summer, they were last done in 2006, so have lasted well.
A bit more progress,had to wait awhile for the gates, and still one more to come. not the best photo, but will post a better one later.View attachment 857670
Time and perseverance will take a snail to Jerusalem. , I still have another one to get yet.I don't feel to bad now, I started around the same time doing a bit of ground work before I could put up the gates, started making the gate below in the Autumn. I was in no rush to finish it as I was looking for suitable gate posts and only got them a few weeks ago. I must get back at it now again, I have another 16ft gate and two 8ft gates to make
View attachment 858017
Not too bad here, we're 1/2 a mile from the main road.Looks great.
Hope gates secured well as someone bound to fancy them??
That's alright as long as you're the only one going through them, we had two 14ft gates at the entrance but an artic driver still managed to destroy one of the posts.Here's a better photo of them, they're 15 ft wide, when I can't get through that width of gate I'll quit.
View attachment 857773View attachment 857774
That's alright as long as you're the only one going through them, we had two 14ft gates at the entrance but an artic driver still managed to destroy one of the posts.