Hired a 3t digger this week, to clean out ditches, and I have got carried away and opened up the silage field that is getting reseeded asap! Ordered pipe today, going to use pebbles off the shore to back fill,
What I would like to know is how much stone is needed on top of the pipe? Trench is 2 1\2 to 3 feet deep,
The pebbles are flat and smooth but are a right mix of sizes form tea cup to dinner plate size, will this be OK? Can't afford stone from the quarry!!